When Government Calls: The Tshwane Rehabilitation Hospital Neurological Ward – Part III
The Tshwane Rehabilitation Hospital project was both similar to and different from the Leratong Hospital project. For starters, the Tshwane brief did not include the installation of fire doors. That particular discipline — the exacting measurement, the custom fabrication, the intumescent seals — was absent from this scope. Nonetheless, this project was, in overall scope, larger than Leratong . Beyond the customary Nurse's Station, there were several in-ward doctor and consultation rooms that had to be furnished, along with patient wardrobes and bathrooms. The Nurse's Station itself was awkwardly shaped — a configuration that did not lend itself easily to standard cabinetry. It resisted straight lines and predictable angles. But we managed to install it anyway, adapting the design to the space rather than forcing the space to conform to the design. As such, most of the modifications and adjustments had to be done on site. That, in its own quiet way, is the essence of installati...